Exhibit 10.1
BEFORE THE KANSAS DEPARTMENT OF HEALTH AND ENVIRONMENT
IN
THE MATTER OF:
|
Case
No. 04-E-0034
|
MGP
Ingredients, Inc.
1300
Main Street
P.O. Box
130
Atchison,
Kansas 66002
Source
ID No. 0050002
AMENDMENT 2 OF CONSENT AGREEMENT AND FINAL ORDER OF THE SECRETARY
Roderick
L. Bremby, Secretary, Kansas Department of Health and Environment (KDHE) and
MGP Ingredients, Inc. (MGP) hereby state and agree:
1. On January 11, 2006, KDHE and MGP entered into
Consent Agreement and Final Order (CAO) for Case No. 04-E-0034, attached
and incorporated herein by reference.
2. Within paragraph 29 of the CAO, MGP agreed to accept
a source-wide Volatile Organic Compound (VOC) cap of 95 tons based on a 12
month rolling average. MGP has failed to
maintain continuous compliance with the VOC cap. On November 23, 2009 KDHE and MGP
entered in to an amendment of the CAO to address the non-compliance with the
VOC cap.
3. On February 23, 2010 MGP and KDHE held a
meeting to address increased production at MGPs facility. MGP noted that the increased production has
caused more VOCs to enter into the cooling tower water and could cause MGP to
exceed the VOC cap. MGP has agreed to
amend paragraph 29 of the CAO and develop a compliance plan, which includes a
specific timeline to replace the existing cooling towers with a new water
cooling system.
4. Paragraph 29 shall be amended to read; Source-wide
VOC Emission Cap: MGP shall accept
source-wide allowable emission caps for the facility equivalent to 95 TPY for
VOCs for a period of twenty-four months or until termination of this CAO
whichever is later. Beginning April 1,
2007, MGP shall continually operate the Facility so as not to exceed the
source-wide allowable emission cap of 95 TPY for VOCs based on a 12-month
rolling sum, rolled monthly, and recorded monthly. For the first eleven months, beginning April 1,
2007, compliance with the 12-month rolling sum will be demonstrated based on a
schedule to meet applicable emission caps as set forth in the approved
CTP. To demonstrate compliance with the
VOC cap, MGP shall replace the existing cooling towers, resulting in a
significant VOC reduction. MGP shall
follow the timeline and submit monthly progress reports. The monthly progress reports shall be
postmarked no later than 30 days after the last day of the month. The first report is due May 30, 2010
covering April 1, 2010 to April 30, 2010. MGP may discontinue the monthly reports upon
written notification from KDHE. The
progress report shall contain information regarding the VOC cap and the
construction progress (e.g. VOC calculations, pictures, explanation of delays
etc.) The timeline to be followed is:
1