Exhibit 10.2
BEFORE THE KANSAS DEPARTMENT OF HEALTH AND ENVIRONMENT
IN
THE MATTER OF:
|
Case
No. 04-E-0034
|
MGP
Ingredients, Inc.
1300
Main Street
P.O. Box
130
Atchison,
Kansas 66002
Source
ID No. 0050002
AMENDMENT I OF CONSENT AGREEMENT AND FINAL ORDER OF THE SECRETARY
Roderick
L. Bremby, Secretary, Kansas Department of Health and Environment (KDHE) and
MGP Ingredients, Inc. (MGP) hereby state and agree:
1. On January 11, 2006, KDHE and MGP entered into
Consent Agreement and Final Order (CAO) for Case No. 04-E-0034, attached
and incorporated herein by reference.
2. Within paragraph 29 of the CAO, MGP agreed to accept
a source-wide VOC cap of 95 tons based on a 12 month rolling average. MGP has failed to maintain continuous
compliance with the VOC cap.
3. Within paragraph 30 and 31 of the CAO, MGP agreed to
conduct a performance test on the DDGS dryer annually and all other units in
accordance with Attachment 2 of the CAO, which requires a test annually for
three years and then a reduced frequency based on the results of the
testing. Since MGP entered into the CAO
on January 11, 2006 annual performance tests were conducted late for units
S1402, S1480, S1567, S1702, the Swiss Combi dryer, the dead box and Boiler #8.
4. Section 6.0 of Attachment 1 of the CAO, MGP
agreed to monitor the pressure drop across Scrubbers S1567, S1402, S1480, and
S1702 daily. MGP failed to monitor the
pressure drop until the first calendar quarter of 2008.
5. Within paragraph 39 of the CAO, MGP agreed to apply
for a federally enforceable construction permit within 180 days after the
execution of the CAO to incorporate provisions of the CAO. As of the date of this agreement MGP has
failed to apply for a federally enforceable construction permit.